Skip to content
Snippets Groups Projects
Commit e717ab72 authored by Eric Kooistra's avatar Eric Kooistra
Browse files

Added #1999, #2004.

parent d9caeddd
No related branches found
No related tags found
No related merge requests found
......@@ -38,7 +38,7 @@ Done) #1654: Arts SC1: Run Arts SC1 with MAC controling the Apertif BF using col
###############################################################################
# SR2 : Fringe stopping 22 Dec
# SR2: Fringe stopping 22 Dec
# - 8 dishes
# - single element beams
# - 130 MHz BW
......@@ -56,7 +56,7 @@ Done) #1098, #1105: Robust flashing
###############################################################################
# SR3 : Compound beams 30 Mar
# SR3: Compound beams 30 Mar
# - Uses the PAF correlator and Cas-A to calibrate for the CB pattern, about 1x per year
Done) #1273: Replace test_arts_0.py by DESP python code: setup_arts.py
......@@ -98,8 +98,8 @@ Done) #1230, 1294: Support PAF calibrator using BF BST
Input CB pointing pattern file for dx,dy #1736 and LO1 frequency and ADU, DCU attenuation settings
|
v
dx,dy --> a,d -\-> #1727 Dish control : standard holog patern
\-> #1726 Signal control : static calibration observation using the PAF correlators
dx,dy --> a,d -\-> #1727 Dish control: standard holog patern
\-> #1726 Signal control: static calibration observation using the PAF correlators
PAF correlation matrices <--/
|
v
......@@ -125,7 +125,7 @@ Done) #1517: Support beamlet mapping for Aperif X and Arts (20 story points)
In March implemented the 63x63, because SR3 deadline was closing in. This works OK and can
be retried using setup_wg.sh and cmd 90.
Done) #1598, #1599, #1600 : Robust flashing--> Daniel
Done) #1598, #1599, #1600: Robust flashing--> Daniel
- See also #1098, #1105 of SR2
- By protecting the factory image
- Use latest unb1_minimal as factory image in all UniBoards
......@@ -136,8 +136,8 @@ Done) #1722: RT4 BSN timeout UNB5-FN1 (node 41)
Done) #1751: Writing application image in central UNB15-BN0 sometimes fails
Done) #1758: FPGA can hang when application image is corrupt
Done) #1870: I2C with RT-D, UNB-7, BN-3, ADU-CD fails and therefore it cannot lock
10 apr: RT8, X --> UNB-5 link issue?
20 apr: RT5, X --> UNB-7 BN-1 link 0 issue? The BSN aligner at the input does not pass on the other 2.
*) #2004: Central UniBoard BSN timeouts (due to link error)
###############################################################################
# SR4 31 May: Include dish C, D and 135 --> 200 MHz BW
......@@ -151,9 +151,10 @@ Done) #895: PPS cable length compensation in BN filterbank
Done) #1937: Make all visibility packet header flags writable by MAC
Software issues
*) #1518 : 135 --> 200 MHz
Kept MAC Rbeam settings in:
Done) #1518: 135 --> 200 MHz
Kept MAC software Rbeam settings in:
$RADIOHDL/applications/apertif/commissioning/mac_rbeam_coreDout.log
On 20 June 2018 --cmd 53 --scheme 300MHz_37CB was PASSED, so the MAC software programs 300MHz_37CB when at 200MHz.
*) #1510: Integrate main.py into MAC software, purpose is to have MAC control and thus know all settings (one captain).
......@@ -169,7 +170,7 @@ Software issues
--> Conclusion: Keep wrap in node_apertif_unb1_fn_beamformer
*) #1931: Confirm complex format of BF weights: is it (Im,Re) or (Re,Im).
*) #1999: Use Apertif X image as factory image to avoid too much flash writing and to speed up main.py
###############################################################################
# SR5 30 Jul: Start of Apertizer observations (enable pre-survey)
......@@ -216,10 +217,7 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
- Failing links during observation can be handled by MAC
- RFI is detected by astronomers at visibility level.
!) #1543: End to end VHDL simulations using MM file IO (20 story points)
- Updated Visio drawings FB, BF, X
- VHDL simulation of the full chain (not feasible, instead use end to end WG - DW tests on hardware)
- Verify visibility output order and output load to DW, see tb_node_apertif_unb1_correlator_processing
Done) #1543: End to end VHDL simulations using MM file IO (20 story points)
*) #1655: Finalize quantisation (8 story points)
- SST
......@@ -249,21 +247,20 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
###############################################################################
# SR-6 : Dual polarization
# SR-6: Dual polarization
*) #1542: End to end WG to Correlator output test (8 story points)
- Intermediate verification points are the SST, BST, but finally the visibilities should be verified given WG for single element BF
- Overwrite statistics before reading to ensure fresh data
- Verify visibility output order and output load to DW using a databuffer in the correlator output, see
tb_node_apertif_unb1_correlator_processing_output
- Verify visibility output order and output load to DW using a databuffer in the correlator output, see also #1543
*) #1868: wpfb_unit_dev force Fchan channel output data to 0 for first N_tap bin samples after sync
###############################################################################
# SR-7 : Full 300 MHz BW and 40 CB
# SR-7: Full 300 MHz BW and 40 CB
*) #1651 : 6-bit mode (20 story points)
*) #1651: 6-bit mode (20 story points)
- Clean up generic dependencies to prepare for supporting 6 bit mode.
- system dynamic range reduces, this can first be verified in 8 bit mode
- parameter ripple through in firmware to support both 8bit and 6bit mode (but not in the same image)
......@@ -274,7 +271,7 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
###############################################################################
# SR-8 : Anti aliasing filter
# SR-8: Anti aliasing filter
*) #1664: Anti aliasing filter
- #1451: Unexpected reconstruction of subband filter transfer function based on channel visibility data
......@@ -285,7 +282,7 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
###############################################################################
# SR-9 : Start of Apertif surveys
# SR-9: Start of Apertif surveys
*) Tasks from commissioning and unforeseen work
- Support MAC
......@@ -299,7 +296,7 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
###############################################################################
# SR-10 : Commensal Apertif and Arts SC3 observations
# SR-10: Commensal Apertif and Arts SC3 observations
......@@ -318,7 +315,7 @@ Done) #1163, #397: Flagging for failing links, RFI ? etc.
- add R_beamout inverse index lookup table generation in R_beamout class of pi_apertif_system.py.
- update or create variant of unb1_board.sdc for qsys regarding get_clocks *u_sopc
- ppsh.vhd decrease c_pipeline_output : NATURAL := 100;
- ppsh.vhd decrease c_pipeline_output: NATURAL := 100;
- add sync_checker stable monitor?
- create tb_dp_bsn_restore_global (partly already covered by tb_dp_block_gen_valid_arr.vhd)
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment