Skip to content
Snippets Groups Projects

Repository graph

You can move around the graph by using the arrow keys.
Select Git revision
  • APERTIF-CXX11
  • APERTIF-external-import
  • CEP-DP3AOFlagGTK-Task11555
  • CEP4-upgrade
  • CMake-Task6733
  • COB-186-correlator-phase-center
  • Cobalt-Release-0_15 protected
  • Cobalt-Release-1_3 protected
  • Cobalt-Release-1_4 protected
  • Cobalt-Release-1_4_1 protected
  • Cobalt-Release-1_4_2 protected
  • Cobalt-Release-1_4_3 protected
  • Cobalt-Release-1_5 protected
  • Cobalt-Release-1_6 protected
  • Cobalt-Release-1_7 protected
  • Cobalt-Task9469
  • Cobalt2-commissioning
  • DATAQualityTT
  • FE_Prod_Fix_01
  • Holography-ROHD2560
  • Before-Remove-TMSS
  • LOFAR-Release-4_4_318 protected
  • LOFAR-Release-4_4_317 protected
  • LOFAR-Release-4_4_316 protected
  • LOFAR-Release-4_4_315 protected
  • LOFAR-Release-4_4_314 protected
  • LOFAR-Release-4_4_313 protected
  • LOFAR-Release-4_4_312 protected
  • LOFAR-Release-4_4_311 protected
  • LOFAR-Release-4_4_310 protected
  • LOFAR-Release-4_4_309 protected
  • LOFAR-Release-4_4_308 protected
  • LOFAR-Release-4_4_307 protected
  • LOFAR-Release-4_4_306 protected
  • LOFAR-Release-4_4_304 protected
  • LOFAR-Release-4_4_303 protected
  • LOFAR-Release-4_4_302 protected
  • LOFAR-Release-4_4_301 protected
  • LOFAR-Release-4_4_300 protected
  • LOFAR-Release-4_4_299 protected
40 results
Created with Raphaël 2.2.027Feb26232221201916151413121198652131Jan3029262524232221191816151211109854231Dec30292827222120191814131211876543130Nov29282724232221201918171615141397632130Oct272624Merge branch 'TMSS-2940-Front-End-Only-Nginx-P2' into 'master'proxy when 404 to index.htmlTMSS-2934: send data with 'unpin_data' flag to backend when performing 'Unpin Data' action in frontendTMSS-2934: allow workflow to finish on SU error/cancelled statusesMerge branch 'TMSS-2940-Nginx-Front-End-Only' into 'master'LOFAR-Release-4…LOFAR-Release-4_4_131Proxies Minio TMSS FrontEnd Acceptence Environment Bucketminor fixtypotypoL2SS-1511: typoLOFAR-Release-4…LOFAR-Release-4_4_130L2SS-1511: in order to prevent us to having to rebuild MACScheduler, taking the pragmatic approach to have two filter options for subtasks wth lofar2 stations, any or allLOFAR-Release-4…LOFAR-Release-4_4_129fixed typoMerge branch 'lofar1and2_stations_in_one_observation' into 'master'LOFAR-Release-4…LOFAR-Release-4_4_128L2SS-1511: fixed testsL2SS-1511: use all lofar1&2 stations for cobalt. Override this in lobster, because lobster is the service controlling lofar2 (and combined) observations.added retry argumentL2SS-1511: use all lofar1&2 stations for cobalt, only lofar1 for stationcontrol.L2SS-1511: only address the lofar2 stations via lobsterL2SS-1511: allow mixing of lofar 1 and 2 stations. Only used lofar1 stations in parset, do not start CorrAppl (Cobalt) via OnlineControl if lofar2-Lobster is already taking care of it.L2SS-1511: removed the restriction of combining lofar1 & 2 stations in one observaton spec.Merge branch 'TMSS-2829' into 'master'lcs128: re-enabled temporarily disabled automatic buildsMerge remote-tracking branch 'origin/master' into TMSS-2913Merge branch 'master' into TMSS-2829as asgreed on the daily, after the intermediate merge from lcs128-runner-upgrades to master, the ci_scu and ci_lta builds were fixed. Also simplified the testing stages.lcs128: as agreed with the team, allow deployment before tests complete. This comes with the responsibility of fixing a deployment if any of the tests faillcs128-runner-u…lcs128-runner-upgradeslcs128: simplified testing stages. Just use one stage running all unit/integration/regression tests. The overall runtime is smaller, and each test is executed only once.lcs128: removed more obsolete MAC leftoverslcs128: updated Dockerfile_ci_base to be based on centos7.9.2009 and made the postgres dependencies working againlcs128: removed obsolete Dockerfile_ci_maclcs128: as discussed with the team, removing lofar1 MAC builds/tests/deploys, as MAC fro lofar1 will not be deployed anymore except for MACScheduler which will be build&deployed once by hand by jorrit to make combined lofar1 and lofar2 observations possiblelcs128: reverted postgres as a gitlab ci serviceTMSS-2913: fix test setuplcs128: temporarily disabled automatic build for build_SCU build_LTAIngest build_Docker build_lofar_pipeline until everything is fixed again on branch lcs128-runner-upgradeslcs128: trying to use postgres as a gitlab ci serviceTMSS-2913: fix test setupTMSS-2913: integrate service in test env, bugfixeslcs128: fixing ci_sculcs128: fixing ci_scuTMSS-2829: merged with runner branch
Loading