Fix/workaround failing integration test
Allow failure of idg-integration-das stage to break circular dependency between IDG tests and DP3.
This is a copy of !105 (closed), with only the commits that are still relevant.
Edited by Bram Veenboer
Allow failure of idg-integration-das stage to break circular dependency between IDG tests and DP3.
This is a copy of !105 (closed), with only the commits that are still relevant.