-
-
L2TS_phase_two4fccf129 · ·
24-05-2023 L2TS phase 2 will shortly start. (CS001, Full station) To make reuse as much as possible form L2TS phase 1 and DTS, the existing scripts are placed in the /old folder. Because array sizes and numbering has changed the scripts must be updated. These old scripts function as building blocks for L2TS processing and configuration scripts. More information: Mark Ruiter (5154), Ruiter@astron.nl